• Brisbane
  • Gold Coast
  • Toowoomba
  • Sunshine Coast

cp_capability_statement_01

For the FKG Group we worked on Wellcamp Airport. This project involved constructing tilt panels for the airport terminal and services building. We: formed panels from shutters at various sizes; cast-in steel work, lifters, ferrules and connection plates; poured and finished; lifted and stood in place ready for structural steel.  
For Bradken Foundry we were engaged to construct foundations for specialised low-tolerance foundations. This included specific design elements to ensure that machinery was held in place accurately.  Designs were completed with engineering specifications and subject to engineering approvals.
Sports Construction Group specialises in all forms of sports courts, including tennis, basketball, netball, cricket, volleyball, and mini courts. They also have experience in concreting and surfacing tennis courts, bowling greens and cricket practice wickets. Concrete Partners is the sole provider of all construction surfaces for Sports Construction Group. We undertake the entire process: all of the earthworks; laser levelling of the base; formsetting and steel placement; pouring with a laser guided screed; finishing to low tolerance specifications; sawcutting as required; and installation of chain wire fencing and sports equipment.      
All Roads – Moreton Bay Rail Project – our team were engaged to construct concrete paths along the new Moreton Bay Railway link.  This included formsetting, steel placing, pour and finish.